The Challenge
9 Plants. Mid-Project Changes. Zero Rollbacks.
The client needed a secure, reliable system built across 9 plant networks - each with a different configuration. Scope changed mid-project. Test data was limited. Zero margin for error.
Three things made this genuinely hard. Every plant had a different configuration. Data needed to flow in one direction only without compromising security. And site testing had to happen with very limited test data available.
What I Did
Built a 1-year technology roadmap and executed it through mid-project changes
- Developed a 1-year technology roadmap to address the complex requirements of secure data transfer across all plants
- Produced detailed documentation that improved stakeholder communication and system understanding throughout the project
- Revised the roadmap mid-project when strategic changes came in, ensuring no delays to delivery
- Installed and configured the system to generate Excel reports in a format GE APM could use
- Placed the software in the DMZ network and set up secure connections to each plant's AMS system through a proxy server
- Conducted complex site testing and verification despite having limited data to work with
The Results
9 out of 9 plants deployed. Zero security breaches. Zero rollbacks.
9 of 9
Plants deployed successfully
Zero
Security breaches or rollbacks
On time
Delivered despite mid-project changes and data limitations